Project name: District heating system Pokupsko
Investor: Municipality of Pokupsko
Location: Pokupsko, Croatia
Construction completion: 2015
Project description
Reason for investing: delivery of heat from a hot water boiler room on biomass with a capacity of 1 MW to the consumers. Pre-insulated steel pipelines DN125, DN80, DN65, and DN50 are installed, with a total route length of about 2 km.
Enerkon participated in the project through following activities:
- Applying for IPARD tender, measure 304 (technical part)
- Preliminary Design
- Main Design
- Supervision of Mechanical Works