Project title: Power plant on municipal waste
Investor: Energetika Celje d.o.o.
Location: Celje, Slovenia
Construction completion: 2008
Project description
Reasons for investing:
- Disposal of the combustible part of municipal waste after processing collected waste; energy recovery of waste
- Minimizing the residue after municipal waste treatment
- Production of 2 MW of electricity for own needs and for the grid, production of 13 MW of thermal energy for city’s heating system
Results of equipment dimensioning:
- Steam boiler 20 t/h, 30 bar, 350 °C
- Choosing a 2 MW backpressure steam turbine
Enerkon participated in the project through following activities:
- Main design of the turbine plant
- Detailed design of the turbine plant
- Boiler documentation