District heating system in Zrinjevac

Project title: Buried pre-insulated heating pipe for greenhouse heating
Investor: Zagrebački holding d.o.o., Zrinjevac branch
Location: Zagreb, Croatia
Construction completion: 2019

Project description

In order to grow seedlings more efficiently, greenhouses need to be heated on colder days. Previously, thermal energy was obtained from the natural gas boiler room, but since Zrinjevac has significant amounts of its own biomass, the possibility of reconstructing the boiler room with the use of biomass - wood chips was imposed. This way, biomass was used efficiently, while at the same time financial savings on heating costs were achieved. The heating pipeline connects the existing biomass boiler room with greenhouses. Inside all greenhouses, fan coils of suitable power are installed.

Enerkon participated in the project through following activities:

  • Execution design
  • Supervision of Mechanical works