Project title: Biomass boiler room with thermal power of 3 MW
Investor: Funda d.o.o.
Location: Zagreb, Croatia
Construction completion: February, 2018
Project description
Reasons for investing:
- High cost of energy for heating – natural gas
- Replacing a fossil fuel with a renewable energy source
Construction of the boiler room was carried out through the ESCO model, which ensures that energy efficiency improvement measures are implemented in public sector buildings without additional spending of budget funds. The reconstruction of the entire boiler room was included in the project with the installation of a new wood biomass boiler - wood chips, as well as the reconstruction of heating substations within the complex.
Results of equipment dimensioning:
- 3 MW hot water boiler, 90/70°C
- Heat accumulator with a volume of 70 m³
- Multi-day biomass tank with a volume of about 250 m³
Enerkon participated in the project through following activities:
- Cost-benefit analysis
- Conceptual solution and equipment dimensioning
- Main design and cost estimate for Public Procurement
- Evaluation of offers
- Detailed design