{"id":1698,"date":"2020-11-03T23:45:22","date_gmt":"2020-11-03T22:45:22","guid":{"rendered":"http:\/\/localhost\/enerkon\/?page_id=1698"},"modified":"2023-03-08T13:47:18","modified_gmt":"2023-03-08T12:47:18","slug":"technical-studies-and-analysis","status":"publish","type":"page","link":"https:\/\/www.enerkon.hr\/eng\/technical-studies-and-analysis\/","title":{"rendered":"Technical studies and analysis"},"content":{"rendered":"<div id=\"pl-1698\"  class=\"panel-layout\" ><div id=\"pg-1698-0\"  class=\"panel-grid panel-no-style\" ><div id=\"pgc-1698-0-0\"  class=\"panel-grid-cell\" ><div id=\"panel-1698-0-0-0\" class=\"so-panel widget widget_sow-editor panel-first-child panel-last-child\" data-index=\"0\" ><div\n\t\t\t\n\t\t\tclass=\"so-widget-sow-editor so-widget-sow-editor-base\"\n\t\t\t\n\t\t>\n<div class=\"siteorigin-widget-tinymce textwidget\">\n\t<ul>\n<li>Technical part of the due diligence for Grubi\u0161no polje biomass cogeneration plant<\/li>\n<li>Technical part of the due diligence for Agroproteinka biogas plant<\/li>\n<li>Investment study for the solution of residual sludge from wastewater treatment plants<\/li>\n<li>Investment study for an energy efficiency project for DIN ENERGO biomass cogeneration plant<\/li>\n<li>Investment study for the construction of a biomass cogeneration plant HRAST Strizivojna<\/li>\n<li>Pre-investment study for a thermal power plant of 28 MW powered by RDF (refuse-derived fuel)<\/li>\n<li>Pre-investment study, Basic techno-economic indicators for the construction of geothermal power plant \"Marija 1\"<\/li>\n<li>Study of the utilization of energy potentials of the County Center for Waste Management (\u017dCGO)<\/li>\n<li>Feasibility study for the disposal of sludge from wastewater treatment plants for Zagreb wastewaters<\/li>\n<li>Feasibility study for the construction of a boiler room with 8MWth biomass heating - Energy audit for energy efficiency measures and the use of renewable energy sources<\/li>\n<li>Feasibility study for hazardous medical waste disposal for the Croatian Ministry of Health<\/li>\n<li>Feasibility study of a waste heat treatment plant Herbos d.d. Sisak<\/li>\n<li>Feasibility study for municipal waste disposal for the city of Celje and 23 municipalities (recycling center, MBO and power plant)<\/li>\n<\/ul>\n<\/div>\n<\/div><\/div><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>Technical part of the due [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"inline_featured_image":false,"footnotes":""},"class_list":["post-1698","page","type-page","status-publish","hentry","post"],"_links":{"self":[{"href":"https:\/\/www.enerkon.hr\/eng\/wp-json\/wp\/v2\/pages\/1698","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.enerkon.hr\/eng\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.enerkon.hr\/eng\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerkon.hr\/eng\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerkon.hr\/eng\/wp-json\/wp\/v2\/comments?post=1698"}],"version-history":[{"count":7,"href":"https:\/\/www.enerkon.hr\/eng\/wp-json\/wp\/v2\/pages\/1698\/revisions"}],"predecessor-version":[{"id":3338,"href":"https:\/\/www.enerkon.hr\/eng\/wp-json\/wp\/v2\/pages\/1698\/revisions\/3338"}],"wp:attachment":[{"href":"https:\/\/www.enerkon.hr\/eng\/wp-json\/wp\/v2\/media?parent=1698"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}