Technical studies and analysis

  • Technical part of the due diligence for Grubišno polje biomass cogeneration plant
  • Technical part of the due diligence for Agroproteinka biogas plant
  • Investment study for the solution of residual sludge from wastewater treatment plants
  • Investment study for an energy efficiency project for DIN ENERGO biomass cogeneration plant
  • Investment study for the construction of a biomass cogeneration plant HRAST Strizivojna
  • Pre-investment study for a thermal power plant of 28 MW powered by RDF (refuse-derived fuel)
  • Pre-investment study, Basic techno-economic indicators for the construction of geothermal power plant "Marija 1"
  • Study of the utilization of energy potentials of the County Center for Waste Management (ŽCGO)
  • Feasibility study for the disposal of sludge from wastewater treatment plants for Zagreb wastewaters
  • Feasibility study for the construction of a boiler room with 8MWth biomass heating - Energy audit for energy efficiency measures and the use of renewable energy sources
  • Feasibility study for hazardous medical waste disposal for the Croatian Ministry of Health
  • Feasibility study of a waste heat treatment plant Herbos d.d. Sisak
  • Feasibility study for municipal waste disposal for the city of Celje and 23 municipalities (recycling center, MBO and power plant)