Project title: mini Hydro Power Plant Dabrova Dolina 1, 225 kW
Investor: Kelemen energija d.o.o.
Location: Tržić Tounjski, Croatia
Construction completion: 2016
Project description
The hydro turbine as well as the associated hydro mechanical equipment is made in Germany, DIVE GmbH. The turbine is of submerged design together with the generator and is located in a turbine chamber. The flow through the turbine is maximum of 5,5 m³/s, net head at the site is 6.4 mVS. Electrical equipment (inverter, electrical cabinets and synchronization equipment) are located in a container next to the turbine. The location does not have the ability to connect to fixed or mobile phone, so a satellite connection is installed to ensure remote monitoring and control of the plant.
Enerkon participated in the project through following activities:
- Preliminary design
- Main design
- Detailed design
- Supervision of Mechanical works
- Chief Supervising Engineer