The company Enerkon completed the project of a cogeneration plant with a natural gas engine, the goal of which was to reduce energy costs in the cogeneration plant and reduce overall emissions.
Enerkon participated in fossil fuels projects through:
- Feasibility study
- Main design
- Detailed design
- Project documentation for the utilization steam boiler with ribbed pipes - a special construction
- Supervision of Mechanical Works