Project title: Construction of a central wastewater treatment plant in the city of Koprivnica 100 000 ES
Investor: GPK Komunalac
Location: Koprivnica, Croatia
Construction completion: 2006
Project description
The wastewater treatment plant consists of the following systems:
- the existing rough grid
- mechanical pre-treatment of wastewater (Phase I)
- wastewater pumping station
- biological phase of purification (phase II)
- accumulation of sludge
- drying of sludge (phase III)
- technology for precipitated sludge treatment in the MID-MIX plant
In this project, for the new wastewater treatment plant in the city of Koprivnica, a purification process with activated sludge is planned as a technical solution, the so-called Sequenced Batch Reactor Technology (SBR).
Enerkon participated in the project through following activities:
- Main Mechanical Engineering Project
- Technological Project